Our method · DMAIC

Define. Measure. Decide.

CoreOpt applies the Six Sigma improvement cycle to one decision at a time: Define, Measure, Analyze, Improve and Control. Every stage leaves a record you can inspect.

Illustrative feasible region bounded by capability, capacity and evidence

DMAIC

From question to controlled decision.

The same five stages a plant uses to improve a process, applied to the decision itself.

  1. Define

    Frame the decision.

    State what is being decided, the target, the deadline and the limits that cannot move.

  2. Measure

    Read every account.

    Pull the records each department already keeps, from production sheets to lab data, stock and dispatch logs.

  3. Analyze

    Find what the reports miss.

    Twelve domain checks run on the same plan. CoreOpt shows where one department’s gain becomes another’s cost.

  4. Improve

    Compare feasible plans.

    Optimization tests the alternatives under real constraints. A separate validation layer recomputes the numbers.

  5. Control

    Record and remember.

    A named person makes the decision. The inputs, conditions and later outcomes go into Decision Memory.

Engineering foundation

What the software demonstrates.

The advisory workspace evaluates one local cement grinding or steel rolling line at a time. Its examples use known inputs so teams can inspect the result.

Specialist checks
Review twelve operational domains with deterministic checks, including maintenance, materials, production, quality and dispatch.
Constrained optimization
Compare modeled contribution, production and cost against the closest feasible plan under supplied limits.
Traceable decisions
Review independently validated results, saved input snapshots, feasible alternatives and named approvals.

Questions about the method

What does Chief AI do?

It interprets a question, stages a workflow and explains evidence. Deterministic solvers and validators retain numerical authority. People review the proposed action.

How are modeled and measured outcomes handled?

A modeled result describes what the supplied assumptions imply. A measured result requires separately recorded implementation and comparable observations.

What data is useful for a pilot?

Start with one decision, its planning horizon, current limits and a description of available data. Share documents through an agreed process.

Work with CoreOpt

Bring one live
decision.

Start with one decision your plant is weighing: an output target, a fuel or material change, an order or a tender. We put every department’s numbers on one account and hand back a record you can review.