Every department keeps its own books. CoreOpt reconciles them into one decision account before anyone signs.

One decision.
Every account.

0 of 3 hidden costs found

Illustrative decision: raise output 12% next month, read department by department.

  • Production: Mill hours available. CoreOpt reads: Fits with 6% headroom
  • Energy: ₹30L saved on a new fuel mix. CoreOpt reads: Saving holds at the new blend
  • Quality: Within spec last month. CoreOpt reads: New blend costs ₹18L in rework and grade loss
  • Materials: Limestone on contract. CoreOpt reads: Stock covers 38 days
  • Inventory: Silo space available. CoreOpt reads: Silos full by day 19 unless dispatch rises
  • Maintenance: Kiln stop in week 3. CoreOpt reads: Stop overlaps the push by 4 days
  • Dispatch: Rakes booked. CoreOpt reads: Rail plan covers 92% of new output

Three costs are hidden between departments: quality rework, silo space and a maintenance overlap. Net of them, the decision is worth ₹12L and can continue with two conditions.

  • DefineFrame the decision
  • MeasureRead every account
  • Analyze12 domain checks
  • ImproveFeasible plans
  • ControlDecision Memory
  • Decision AccountOne ledger
  • TendersOne input among many

Why CoreOpt

Every department reports its own number. Energy saves ₹30L and quality quietly absorbs ₹18L. CoreOpt puts both on one decision account, so the plant sees the real ₹12L before it commits.

Domain checks per decision
12
DMAIC stages
05
Decision account
01

The platform

Every account.
One decision.

Six capabilities share one model of your plant. The Decision Account sits at the centre; tenders and supplier matching feed into it.

  1. 01 / 06Decision Account

    One account for every department.

    Production, energy, quality, materials, stock, maintenance, staffing and dispatch each keep their own numbers. CoreOpt reconciles them into one decision account, so the cost one department saves and the cost another absorbs sit on the same line.

    OutputOne economic ledger per decision, with every department’s effect itemised.

    More on Decision Account
  2. 02 / 06Chief AI

    Twelve specialists, one conclusion.

    Chief AI frames the question in plain language, assigns twelve domain checks and brings them back into a single management conclusion. Deterministic solvers and validators keep numerical authority. People make the call.

    OutputContinue with named conditions, or do not continue with reasons stated.

    More on Chief AI
  3. 03 / 06Optimize

    Compare the ways you could commit.

    Find the closest feasible plan, the highest contribution, the highest output or the lowest cost under the same constraints, and see which limit binds each one.

    OutputFeasible alternatives, binding constraints and modelled trade-offs.

    More on Optimize
  4. 04 / 06Assure

    Keep the decision under control.

    Every recommendation is recomputed independently, saved with its inputs and assumptions, and recorded with a named reviewer. Decision Memory carries past decisions and outcomes into the next one.

    OutputA reviewable record and a memory of what the plant decided before.

    More on Assure
  5. 05 / 06Tenders

    Read an opportunity against the plant.

    When the decision starts outside the plant, CoreOpt reads tender requirements against the capability, capacity and evidence your team can bring, then passes them into the same decision account.

    OutputOpportunity brief, capability match and questions to resolve.

    More on Tenders
  6. 06 / 06Connect

    Find manufacturing capability that fits.

    The procurement network is intended to help issuers discover manufacturers by process capability, capacity and relevant evidence.

    OutputContext for evaluating a potential supplier or production partner.

    More on Connect

Optimization engines

Six decisions.
One model of your plant.

The V1–V6 engines run deterministic optimization on the same constraints, from next month’s plan to the capability you invest in next.

  1. V1Plan feasibilityCan the plant take on this target or order with the capacity, materials and evidence it has today? Horizon: This plan Output: A feasibility assessment and the constraints that bind.
  2. V2Gap optimizationWhat changes would make the plan feasible, and what would each change cost across departments? Horizon: This plan Output: A comparison of gap-closing options and their trade-offs.
  3. V3Order and bid optimizationWhich scope, timing and commercial terms produce a defensible commitment, including tenders? Horizon: This order Output: Alternatives that show the trade-offs among scope, timing and economics.
  4. V4Delivery planningHow could we sequence work across constrained resources while protecting current commitments? Horizon: This quarter Output: A delivery plan with capacity and scheduling assumptions.
  5. V5Portfolio optimizationWhich combination of plans and orders fits the same pool of capacity, time and capital? Horizon: This year Output: A view of competing commitments and portfolio-level trade-offs.
  6. V6Capability investmentWhat capability should the plant add, expand or qualify next? Horizon: Multi-year Output: A comparison of investment options and what each could unlock.

Try it

One target.
Three ways forward.

The mills can make 12% more. Can the rest of the plant absorb it? Switch between the options and watch the binding constraint move.

Plan feasibility · V1Illustrative scenario

Next month

Cement grinding, +12%

Compare mill hours and silo space with what each option needs over the month.

+12% from week 1

Over capacity

The silos fill before the month ends.

Twelve percent more output needs 41 kt of silo space. Booked dispatch leaves 30 kt free, so the plant stops by day 19.

Mill hours92 / 100 h
Silo space41 / 30 kt

+12% with 4 extra rakes

Conditional fit

Extra dispatch keeps the silos clear.

Four more rakes move 12 kt. Silo use drops to 29 kt. Confirm the rail slots and the freight cost before committing.

Mill hours92 / 100 h
Silo space29 / 30 kt

+6% then +12% after the stop

Fits the month

Hold the push until the kiln restarts.

Run +6% before the week-3 kiln stop and +12% after it. Silo use stays at 26 kt and maintenance keeps its window.

Mill hours84 / 100 h
Silo space26 / 30 kt

Line marks available capacity Feasibility and gap engines ↗ Illustrative figures

The whole plant in one account.

Every recommendation keeps its inputs, the constraints that bound it, an independent check and the person who approved it.

The method · DMAIC

Six Sigma discipline for every decision.

CoreOpt works each decision through Define, Measure, Analyze, Improve and Control, the cycle plants already use to improve a process.

Read the method
DDefine

Frame the decision.

State what is being decided, the target, the deadline and the limits that cannot move.

MMeasure

Read every account.

Pull the records each department already keeps, from production sheets to lab data, stock and dispatch logs.

AAnalyze

Find what the reports miss.

Twelve domain checks run on the same plan. CoreOpt shows where one department’s gain becomes another’s cost.

IImprove

Compare feasible plans.

Optimization tests the alternatives under real constraints. A separate validation layer recomputes the numbers.

CControl

Record and remember.

A named person makes the decision. The inputs, conditions and later outcomes go into Decision Memory.

Where it applies

Built around
real constraints.

The same decision account applies wherever departments share capacity. Cement and steel are the working foundation; aerospace and defence brings the tender side.

Illustrative tender scenario

Can we deliver this package within the required window?

A precision manufacturer checks machining capacity, inspection requirements and qualification evidence against a sample tender.

Binding constraint
Inspection capacity and qualification evidence
Next decision
Compare a phased commitment with additional qualified capacity.
Illustrative five-axis machined titanium component

Founders

The people building CoreOpt

Aaryan Kansal and Shreyas Srivastava started CoreOpt to put a whole plant’s numbers on one decision account. Between them: civil engineering, chemical engineering, mathematics and time inside a cement plant.

  • Two co-founders
  • Engineering
  • Mathematics

Talk to the founders

About

We are two engineers building CoreOpt, by way of a civil engineering degree, a chemical engineering degree and a master’s in mathematics.

A plant decision touches production, energy, quality, stock, maintenance and dispatch at once, and each keeps its own numbers. The people who sign need one account of the combined effect, before they commit rather than after.

CoreOpt reconciles those accounts and works each decision through Define, Measure, Analyze, Improve and Control. Tenders are one way a decision arrives. People own the decision. The software shows the trade-offs.

01 / Co-founder

Aaryan Kansal

Civil engineer by training, with a B.E. in Civil Engineering from BITS Hyderabad.

  • Civil engineering
  • BITS Hyderabad

02 / Co-founder

Shreyas Srivastava

Trained in chemical engineering (B.E.) and mathematics (M.Sc.), with an internship at UltraTech Cement, Hirmi.

  • Chemical engineering
  • M.Sc. Mathematics
  • Cement plant internship
Founders
Aaryan Kansal, Shreyas Srivastava
Backgrounds
Civil engineering, chemical engineering, mathematics
First market
Aerospace and defence
Working foundation
Cement and steel
Stage
Looking for first pilots

Working on one consequential decision? Tell us about it ↗

Work with CoreOpt

Bring one live
decision.

Start with one decision your plant is weighing: an output target, a fuel or material change, an order or a tender. We put every department’s numbers on one account and hand back a record you can review.